• Follow us
  • Facebook
  • Twitter
  • Linkedin
  • YouTube
  • RSS
  • Contact us

Getting access to our website

Read more

Search form
From the christening of HOLLY BEACH on 14 October. © DOTD

From the christening of HOLLY BEACH on 14 October. © DOTD

Completion of the first of two hybrid-electric ferries built for Cameron crossing

FerryThe Louisiana Department of Transportation and Development (DOTD) christened HOLLY BEACH on 14 October, marking completion of the first of two hybrid-electric ferries built by US-based Thoma-Sea Marine Constructors for the Cameron crossing in Cameron Parish.

The USD 49.7 million project includes HOLLY BEACH and sister vessel CAMERON, each measuring 58 × 15 × 4 metres and carrying up to 34 vehicles. They will replace the 1964-built CAMERON II. CAMERON is expected to be completed in late November.

Designed by Elliott Bay Design Group, the ferries will improve reliability for traffic crossing the Calcasieu Ship Channel. When CAMERON II is unavailable, a temporary side-loading ferry cannot accommodate trucks longer than 15 metres, forcing them onto a detour adding more than two hours.

The new USCG Subchapter H ferries will maintain service for large commercial vehicles when one vessel is unavailable and support emergency evacuations.

They are among the first US-built ferries equipped with Siemens Energy’s Blue Drive Eco hybrid propulsion system. Diesel engines share the load with batteries, maximising battery used to reduce exhaust emissions. Both vessels also feature Thrustmaster azimuthing thrusters.

Secretary of DOTD, Glenn Ledet joined state and local leaders to celebrate the christening.

"Completing the first of two new ferryboats for the Cameron Crossing marks a major milestone for this project. We’re replacing an aging ferry that has been in service since the 1960s. Our administration is dedicated to modernizing Louisiana’s infrastructure and attracting economic development through projects like this one," Glenn Ledet said.

Read also: Thoma-Sea named apparent low bidder for TUSTUMENA replacement at USD 350 million

© Shippax

Rendering of HOLLY BEACH / CAMERON. © Elliott Bay Design Group

Rendering of HOLLY BEACH / CAMERON. © Elliott Bay Design Group

okt 19 2026


Get the latest news - for FREE

Receive our weekly newsletter with the latest news and unique special offers.

Products

Shippax Info

Our monthly magazine + Online Access.1 year subscription.

More

Shippax Market 26

Market reports & outlook

More

Shippax Guide 26

JANTAR UNITY

More

Shippax Designs 25

STENA FUTURA

More

Shippax Database - Single user

Shippax Database online

More

Ferry Statistics

Price upon request

More

Don’t miss out!

The place to meet the ferry shipping industry!