
MARGARITA SALAS will be a near sister to ELEANOR ROOSEVELT © Baleària
Baleària confirms order for a near sister to ELEANOR ROOSEVELT
okt 31 2022
High-speedBaleària has begun the construction of a second LNG dual fuel high-speed catamaran at the Armon shipyard in Gijón as a result of the satisfaction with ELEANOR ROOSEVELT delivered in April 2021 from the same yard. The new vessel will bear the name of pioneering biochemist MARGARITA SALAS and is expected to start operating in 2024.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Tallink passenger vessel ROMANTIKA returns to Tallinn–Stockholm route for the summer season
jun 08 2026
Baleària Canarias unveils summer programme with 12-ship fleet to boost inter-island links
jun 02 2026
Missing routes, not price, hold back UK ferry travellers
jun 02 2026





















