Finally back in service © Christian Costa
PETER PAN back in service
Jun 01 2018
FerryTT-Line’s PETER PAN is finally back in service following her 30-metre lengthening and rebuild at German Dry Docks.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 23 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024