• Follow us
  • Facebook
  • Twitter
  • Linkedin
  • YouTube
  • RSS
  • Contact us

Getting access to our website

Read more

Search form
Representation of ABB's hybrid propulsion system for the 160 Auto Ferry Class. ©  ABB

Representation of ABB's hybrid propulsion system for the 160 Auto Ferry Class. © ABB

ABB to power third Washington State Ferries hybrid-electric newbuild vessel

FerryWashington State Ferries gives ABB the go-ahead for the third vessel in its ferry fleet modernization and electrification program This expands ABB’s involvement in the program from two vessels to three and is part of Washington State Ferries’ broader plan for up to 16 new hybrid electric ferries by 2040.

As with the first two vessels, ABB will equip the third vessel with an integrated hybrid-electric power and propulsion solution cantered on Onboard DC Grid and PEMS Power and Energy Management System. With Onboard DC Grid maximizing power distribution efficiency and energy storage integration, PEMS continuously manages available power sources to optimize energy use for vessel operating conditions.

This reduces reliance on diesel engines, thereby helping to reduce fuel consumption and emissions. The 13.2-megawatt-hour energy storage system integrated by ABB is designed to enable all-electric, zero-emissions operations on short routes and in port.

ABB’s scope of supply across the first three vessels also includes integrated marine automation, propulsion drives and motors, transformers, low-voltage systems, uninterruptible power supply systems, remote diagnostics, propulsion shafting, propellers, steering gear and rudders, in addition to engineering and commissioning support.

Washington State Ferries’ electrification program targets emission reductions of 76% in carbon dioxide, 75% in sulphur oxides, 94% in nitrous oxides, and 90% in particulate matter by 2040 – and ultimately envisions an emission-free fleet by 20505.

The order further builds on ABB’s earlier involvement as the propulsion single source vendor in Washington State Ferries’ project, announced in 2024, with the contract amended to reflect the confirmed initial shipbuilding contract for two ships plus one option.

Read also: First steel for new WSF ferries was cut while option on a third unit was exercised 

© Shippax

nov 01 2026


Get the latest news - for FREE

Receive our weekly newsletter with the latest news and unique special offers.

Products

Shippax Info

Our monthly magazine + Online Access.1 year subscription.

More

Shippax Market 26

Market reports & outlook

More

Shippax Guide 26

JANTAR UNITY

More

Shippax Designs 25

STENA FUTURA

More

Shippax Database - Single user

Shippax Database online

More

Ferry Statistics

Price upon request

More

Don’t miss out!

The place to meet the ferry shipping industry!