© Costa Cruises
Assembly of LNG-powered COSTA SMERALDA started at Meyer Turku
Jul 04 2018
CruiseOn 4 July the assembly of Costa Cruises’ 182,700gt COSTA SMERALDA officially started at the Meyer Turku shipyard. The cruise ship, which will be delivered in October 2019, will be followed by a sister ship 2021.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 23 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024