
The newbuilding will be reminiscent of the 2010-built LODI © Stadtwerke Konstanz
Pella Sietas Werft to build LNG-powered Lake Constance ferry
mar 15 2018
Ferry‘Stadtwerke Konstanz’, operators of the Konstanz-Meersburg ferry service, has signed a contract with Pella Sietas Werft for the construction of an LNG-powered double-ended inland ferry with a capacity exceeding 60 CEUs and 700 passengers.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Grimaldi adds capacity to Turkiye route
nov 02 2026
Mazda renews its feeder fleet
nov 02 2026
Jadrolinija soon to tender for new RoPax tonnage
nov 02 2026
Most read
Funding secured for BESS capacity in Igoumenitsa Port
nov 01 2026
ANALYSIS: Color Line is currently the larger operator in their shared market – both companies serve the same long corridor
okt 28 2026






















