MENJA © Fanølinjen
Molslinjen/Fanølinjen orders full-electric ferry at Hvide Sande Shipyard
Jan 07 2020
FerryMolslinjen/Fanølinjen has decided to replace the diminutive 1962-built passenger-only Esbjerg-Fanø ferry SØNDERHO by a full-electric ferry to be built at Hvide Sande Shipyard with delivery scheduled in 2021. For redundancy’s sake, the ferry will also boast a diesel-powered engine.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 25 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024
The MSC Foundation, The MSC Group and Mercy Ships International join forces to build a new hospital ship
Apr 23 2024