MARIA GRAZIA ONORATO seen arriving at Fayard for the scrubber installation © Peter Therkildsen
MARIA GRAZIA ONORATO delivered
Mar 19 2019
Ro-roOn 14 March Flensburger Schiffbau-Gesellschaft (FSG) handed over MARIA GRAZIA ONORATO to the Siem Group. The 4,076-lanemetre freighter left the German yard for Fayard in Odense on 18 March.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 25 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024
The MSC Foundation, The MSC Group and Mercy Ships International join forces to build a new hospital ship
Apr 23 2024