
ECO MALTA delivered © Grimaldi Lines
Grimaldi takes delivery of ECO MALTA from Jinling
mar 03 2022
Ro-roGrimaldi Lines has reached the halfway point of its short-sea ro-ro fleet upgrade programme with the delivery of the 7.800 lanemetre capacity ECO MALTA from China’s Jinling Shipyard on 1 March. ECO MALTA is the sixth of 12 Grimaldi Green 5th Generation (GG5G) ro-ros; the first five vessels are currently in operation in the Mediterranean.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Tallink passenger vessel ROMANTIKA returns to Tallinn–Stockholm route for the summer season
jun 08 2026
Baleària Canarias unveils summer programme with 12-ship fleet to boost inter-island links
jun 02 2026
Missing routes, not price, hold back UK ferry travellers
jun 02 2026





















