AIDAnova was the lead ship in the series and was delivered in December 2018 © Meyer Werft
First steel cut for second LNG-powered AIDA cruise ship
Aug 20 2019
CruiseFollowing the first steel cut, Meyer Werft has officially started with the production of its yard number S709, the second in a series of three LNG-powered ships built by the German yard for AIDA Cruises.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 25 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024
The MSC Foundation, The MSC Group and Mercy Ships International join forces to build a new hospital ship
Apr 23 2024