Astilleros Armon and Baleària recently held the keel laying ceromony for ELEANOR ROOSEVELT © Baleària
Armon lays keel for Baleària’s ‘smart’ high-speed catamaran
Jul 01 2019
High-speedThe keel has been laid at the Armon shipyard in Gijon for Baleària’s first LNG-powered ro-pax fast craft. To be named ELEANOR ROOSEVELT, the 125m long and 28m high-speed ferry is due for delivery in spring 2020.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Tallink Grupp Q1 2024 financial results
Apr 26 2024
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 25 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024
The MSC Foundation, The MSC Group and Mercy Ships International join forces to build a new hospital ship
Apr 23 2024