
Steel cut ceremony held for E-Flexer CAPU ROSSU
FerryA steel cut ceremony was held at the CMI Jinling shipyard in Weihai for CAPU ROSSU, the LNG E-Flexer bound for Corsica Linea. CAPU ROSSU will be the company’s second LNG vessel, following the Visentini-built A GALEOTTA.
Expected for the 2026 season on the Ajaccio to Bastia route, the commissioning of the CAPU ROSSU is a major step forward in the deployment of Corsica Linea’s strategic plan to achieve a 40% reduction in their CO2 emissions by 2030 and get closer to "net zero" in 2040!
CAPU ROSSU:
Length: 203 m
Beam: 27.80 m
Draught: 6.50 m
Passengers: 1,000
Passenger cabins: 235
Number of decks: 10
Facilities: 1 restaurant (300 places) – 1 snack (250 places) – 1 bar (350 places)
Garage capacity: 135 trailers + 180 vehicles (2,500 lane metres)
Machinery: 2 x Wärtsila 12V46DF (13,740 KW each). Multi-fuel capable, and can run on LNG, MGO or biodiesel
Max. speed: 23 knots
© Shippax

Sep 19 2024
Most read
Neste and Eckerö Line continue collaborating to reduce maritime emissions in the Baltic Sea
Apr 24 2025
Members of the Meyer Turku Board of directors appointed
Apr 25 2025