• Follow us
  • Facebook
  • Twitter
  • Linkedin
  • YouTube
  • RSS
  • Contact us

Getting access to our website

Read more

Search form

Fjord1 chooses NES as the system integrator for three ferries

Norwegian Electric Systems (NES) will deliver battery systems, integrated electrical and automation packages for the conversion of three 125-car ferries for the ferry link Halsa - Kanestraum.

The conversion of the ferries in the Moldefjord series is scheduled to start during the last half of 2020, and both ferry berths are being rebuilt with a complete land based charging system.

Good teamwork
This will be NES` delivery numbers 16, 17 and 18 of hybrid electric ferries to Fjord1.

'NES is humble and proud that Fjord1 once again has chosen NES as partner for their remodelling projects. Through good dialogue, we ensure sustainable and safe solutions for the future zero-emission ferries, stated Stein Ruben Larsen, Sales Manager at NES.'

Project Director Nils Kristian Berge in Fjord1 says that they are very satisfied with NES system solutions from NES, and therefore Fjord1 has chosen them again. 
'After several previous deliveries to our ferries, we have gained good experience with NES.  We know that we will get quality solutions that contribute to our effort to set a high standard and to Fjord1's leading position in the operation of zero-emission ferries in Norway.'

Optimized technical solutions
The ferries that will be converted were designed by LMG Marin in Bergen, and built by Remontowa        in Poland in 2009/2010. After having their gas engines replaced with batteries and charging systems, they will become zero-emission ferries.

NES has previously converted ferries from diesel-mechanical to both diesel-electric propulsion and hybrid propulsion. The deliveries in these contracts mainly consist of:

  • QUEST II charging system that will be integrated into the existing ship's propulsion systems
  • Battery systems
  • Charging plugs and transformers
  • Upgrading of the ship's IAS and PMS systems
  • Integration of the environmental reporting system SPM (Ship Performance Monitoring)

 On land, the followings must be delivered:

  • Charging plug
  • Power and charging systems

jan 24 2020


Get the latest news - for FREE

Receive our weekly newsletter with the latest news and unique special offers.

Products

Shippax Info

Our monthly magazine + Online Access.1 year subscription.

More

Shippax Designs 25

STENA FUTURA

More

Shippax Market 25

Market reports & outlook

More

Shippax Guide 25

SAINT-MALO

More

Shippax Database - Single user

Shippax Database online

More

Ferry Statistics

Price upon request

More

Don’t miss out!

The place to meet the ferry shipping industry!