
Illustration of ALTERA © Finferries
Finferries has received the ferry ALTERA
On June 29, 2022, Finferries received the new battery hybrid ferry ALTERA at the shipyard Crist S.A. in Gdynia and the ship will be towed to Turku in July.
ALTERA is 104 meters long, 16.5 meters wide and have a draft of 3.5 meters. ALTERA can accommodate 92 cars and the maximum number of passengers is 375.
ALTERA will start operating on the Pargas – Nagu route no later than 1.1.2023.
Jun 30 2022