MAZARINE is getting an extra trailer deck above the existing weather deck © Remontowa Shiprepair Yard
MAZARINE undergoing conversion in Poland
Sep 25 2019
Ro-roCLdN has sent its 2,907-lanemetre MAZARINE to Remontowa Shiprepair Yard in Gdansk to add an extra trailer deck above the weather deck similar to OPALINE and sister AMANDINE which were enlarged prior to their delivery from builders Flensburger Schiffbau-Gesellschaft, increasing the intake to 3,923 lanemetres.
You are not logged in
Login in or become a member to read all the articles on shippax.com
- Access to our online news service
- Extended search function
- Instant access after purchase
- And much more!
Most read
Shippax Ferry Conference - less than three weeks left. Last chance to book! (Upd. 25 Apr)
Apr 23 2024
DFDS initiates hybrid-electric ro-pax vessel design study with Incat for Channel Island tender
Apr 23 2024